Who is responsible for the fee of an additional Full-time Supervisor at the project?

  1. Architect

  2. Owner

  3. Contractor

  4. Sub-Contractor

The correct answer is: Architect

In a construction project, the responsibility for the fees associated with additional personnel such as a Full-time Supervisor typically falls under the Architect's role, especially if the extra supervision is deemed necessary for ensuring that the project adheres to design specifications, quality control, and safety standards. The Architect may recognize that the complexity of the project or specific circumstances require heightened oversight to meet contractual obligations and maintain the integrity of the architectural vision. The Architect's responsibilities often include not just initial design work but also ongoing project management and oversight. If the need for a Full-time Supervisor arises after the project begins, the Architect usually has the authority to recommend or necessitate this position based on the workload, complexity, or issues observed on-site. Consequently, the financial implications might also rest with the Architect, particularly if they decide that such a role is essential for the successful completion of the project. In contrast, the Owner is usually responsible for overall project funding but may not directly control the hiring of specific supervisors unless stipulated in the contract. The Contractor generally manages the onsite team and operations, which includes hiring personnel necessary for their scope. Sub-Contractors are typically engaged for specific tasks and wouldn’t be responsible for overall project supervision fees, which fall outside their contracted duties.